Free template · 30 days

Free 30-day construction schedule template.

A ready-to-use schedule for small remodel, installation, and HVAC crews. Five phases, sixteen tasks, owners, durations, and dependencies — the structure that keeps a 30-day job from slipping into week seven.

No email required · Excel or ScheBot · 5 phases / 16 tasks

Remodel Installation HVAC / electrical Events
Inspection depends on 3 trades
2-day buffer before handover
What's inside

Phases, owners, and the dependencies people forget.

Most schedule templates are a list of tasks. This one keeps the two columns that prevent rework: who owns it, and what must finish first.

01

5 phases, 16 tasks

Demo → framing → rough-in → inspection → finish → handover, plus a 2-day buffer before the client walkthrough.

02

Owner on every row

“Crew A”, “Crew C”, “Inspector”, “PM” — so the schedule answers “who is doing what next week” without a phone call.

03

Dependency column

Inspection depends on electrical, plumbing, and HVAC. Change one date and you can see what moves with it.

Preview

What the file looks like.

Open it in Excel or Google Sheets. The first ten rows:

PhaseTaskOwnerStart dayDurationDepends on
DemoProtect floors and disconnect utilitiesCrew A11—
DemoRemove cabinets and fixturesCrew A21Demo - Protect floors
FramingLayout and framing changesCrew B32Demo - Remove cabinets
ElectricalRough-in electricalCrew C52Framing
PlumbingRough-in plumbingCrew C52Framing
HVACDuct and vent adjustmentsCrew C62Framing
InspectionRough-in inspectionInspector81Electrical; Plumbing; HVAC
InsulationInsulation and drywallCrew B93Inspection
DrywallDrywall finish and sandingCrew B123Insulation
PaintPrime and paintCrew D153Drywall

The CSV includes all 16 tasks plus the buffer. Download it here.

Use it in Excel

Three steps, no macros.

1. Open the CSV

Excel → Data → From Text/CSV, or double-click the file. Keep “Start day” and “Duration” as numbers.

2. Add your dates

Set the project start date, then calculate each task date as start + day. Add conditional formatting for overdue rows.

3. Keep the dependency column

When a date moves, the dependency column tells you what else has to move. Delete it and the schedule becomes a wish list.

Use it in ScheBot

Same structure, but the crew can see it on a phone.

Load the template once, then update it from site. ScheBot flags double-booked crews and broken dependencies before you publish.

1. Create the project

Name it, set the 30-day window, invite the crew.

2. Map the rows

Each CSV row becomes a task: phase, owner, start day, duration, dependency.

3. Check conflicts

ScheBot checks leave, non-working days, and crew overload before the plan goes out.

FAQ

Questions about the template.

Is the construction schedule template free?

Yes. Download the CSV without an email address. Use it in Excel, Google Sheets, or load it into ScheBot.

Can I edit it for HVAC or electrical work?

Yes. Rename phases and tasks, change durations, and keep the dependency column. The structure works for remodel, installation, HVAC, electrical, and event production schedules.

How do I load the template into ScheBot?

Create a project in ScheBot, then map each row to a task: phase, owner, start day, duration, and dependency. Book a 20-minute demo and we will load it with you.